Friday, May 7, 2010

Bike is ready for the road

mods to date are:
relocated coil (between the jugs using self made bracket)
relocated ignition (below seat near tank)
lifted the tank 1.5 inch
hid the wiring loom under the tank
fitted side mount plate
fitted forward controls
stripped the baffles outta the original pipes and scotchbrited





0 comments:

Post a Comment

Blog Archive